An overtime scenario should use the pay rules and cost amounts applicable to the actual arrangement, supplied by the business or its payroll adviser. This worksheet does not determine eligibility, required multipliers, or legal scheduling limits. It compares the arithmetic after those inputs are known and asks how much useful coverage each option delivers.
Start with incremental payments
Suppose a business enters 16 extra hours, a $30 base hourly amount, and a hypothetical 1.4 pay multiplier. Direct pay for those hours is 16 × $30 × 1.4 = $672. Additional employer costs entered as a dollar amount are $80, making the modeled incremental payment $752. The multiplier is an illustrative input, not a statutory overtime rate.
Extra-hour payment = extra hours × base rate × entered multiplier + entered additional costs
If the extra work is expected to deliver 14 accepted productive hours, the cost per productive hour is $752 divided by 14, or $53.71. Dividing by all 16 paid hours instead gives $47.00. Record which denominator is used. Travel, handoff, setup, fatigue, or rework can change the relationship between paid time and accepted output.
Put alternatives on equal output
An outside provider offers 14 accepted hours for an invented $58 per hour plus a $100 handoff charge. That option totals $912, or $65.14 per accepted hour. The modeled payment difference is $160. It does not prove the extra-hour plan is preferable, because quality, availability, schedule constraints, and the accuracy of the output assumption still need review.
| Option | Payment | Expected accepted hours | Cost per accepted hour |
|---|---|---|---|
| Entered extra-hour arrangement | $752 | 14 | $53.71 |
| Outside coverage | $912 | 14 | $65.14 |
| Defer the task | $0 immediately | 0 this period | Undefined |
Deferring the task has no immediate coverage payment, but it may move work into a busier period or lose a time-sensitive order. Estimate those effects from the actual due date. Do not label the zero immediate payment as zero total business cost, and do not invent a penalty when none has been established.
Test the output assumption
If the extra-hour plan produces only 10 accepted hours, its effective cost rises to $75.20 per accepted hour. The outside plan may then look different, but the alternatives no longer deliver equal amounts unless a further four hours are purchased or deferred. Preserve that shortfall explicitly in the decision table.
Use time and acceptance records to review the scenario after the work is complete. Separate regular wages already committed from payments caused by the extra hours. Avoid counting the same benefits both in an hourly loaded rate and in the additional-cost field. Round payments to cents after calculation, retain unfavorable differences, and obtain the appropriate review of any employment rules before relying on the entered terms.
Method references: BLS: Employer Costs for Employee Compensation concepts. Accessed October 22, 2026. All dollar figures are hypothetical worked examples.
Related calculators & guides
- Fully Loaded Employee Cost: Build the Cost Stack
- Labor Cost per Productive Hour
- Employee vs Contractor: Compare Equal Capacity
- Onboarding Ramp Cost: Time, Cash and Capacity
- Vacancy Cost: Measure the Uncovered Work
- Allocate Benefit Costs Without Double Counting
- Part-Time Staffing Cost and Coverage Gaps
- Staffing Utilization: Capacity and Cost per Hour
- Contractor Minimums: Effective Cost of Used Hours
- Employee Cost Calculator
- Employee vs Contractor Cost Calculator
- Staffing Productive-Hour Cost Table
- Staffing Budget Worked Example
- Staffing Cost and Capacity Planning
Report an error
Thank you! Your feedback helps us make this page better.
Could not send. Please try again.