Marginal Cost vs Average Cost: The Difference

Marginal cost and average cost compared on one cost schedule: what each measures, why the average bottoms out where marginal cost crosses it, and which one to use for a pricing decision.

By PriceAndProfit Editorial Updated

Next unit vs every unit Short answer

marginal cost is what the next units add to total cost; average cost is total cost divided by all units made so far

Both numbers come from the same total cost, but they answer different questions. Average cost asks what one unit costs when the whole period's cost is shared out. Marginal cost asks what producing more would add. A business with high fixed costs can have an average cost far above its marginal cost, which is why an extra order at a modest price can still be worth taking — and why pricing everything at that modest price would not cover the rent.

Marginal and average cost compared
Marginal costAverage cost
Formula Change in total cost ÷ change in output Total cost ÷ output
Includes fixed costs? Only those that change with the step All of them, spread over every unit
Answers Is an extra order or batch worth it? Does the price cover the full cost?
Typical decision Special orders, overtime, an extra shift List prices, product profitability

One schedule, two measures

The hypothetical schedule below starts with $2,000 of fixed cost. Marginal cost is shown per unit for each step of 100 units. While marginal cost is below the average, every step pulls the average down. Between 600 and 700 units overtime pushes marginal cost to $10, above the $9 average, and the average turns up. The average is lowest at 600 units, the point where marginal cost crosses it.

Hypothetical cost schedule, $2,000 fixed
OutputTotal costMarginal cost per unit (last 100)Average cost per unit
100 $2,600 $6.00 $26.00
200 $3,100 $5.00 $15.50
300 $3,550 $4.50 $11.83
400 $4,050 $5.00 $10.13
500 $4,650 $6.00 $9.30
600 $5,400 $7.50 $9.00
700 $6,400 $10.00 $9.14

Marginal cost

  • Use it for: One-off decisions with spare capacity: a special order, a rush batch, whether to run overtime.
  • Watch out for: It ignores fixed costs that do not change with the step, so it can never be the price floor for all sales.

Average cost

  • Use it for: Regular prices and product profitability, where every unit must carry its share of fixed cost.
  • Watch out for: It is only valid at the volume it was calculated for; fixed cost per unit rises when volume falls.
Bottom line

Price the business on average cost at a realistic volume; judge an extra order on its marginal cost, as long as it does not displace full-price sales.

Worked decision: at 600 units a customer offers $8.50 a unit for 100 more. That is below the $9 average, but the extra 100 would cost $10 each because of overtime — the order loses $150. Had the business been at 400 units, the next 100 would have cost $6 each and the same order would have added $250. The price did not change; the marginal cost did.

Method references: OpenStax: Costs in the Short Run; OpenStax: Basic Cost Behavior Patterns. Checked October 26, 2026. The schedule is hypothetical.