  1. Rebuild the unit cost stack
  2. Specify what the price change should preserve
  3. Include fixed costs and timing

A cost-increase scenario should identify which inputs change and how those changes flow into the unit cost. Applying one percentage to every expense can obscure the difference between a supplier price change, a fixed subscription increase, and a larger quantity purchased. Use actual quotes when available; the percentages below are hypothetical scenario inputs, not an inflation forecast.

Rebuild the unit cost stack

Suppose a product sells for $50 and has $18 of materials, $4 of packaging, and $3 of delivery-related variable cost. Total variable cost is $25 and contribution is $25. In the scenario, materials increase 10%, packaging increases 5%, and delivery cost stays unchanged. Revised unit cost is $19.80 + $4.20 + $3.00 = $27.00.

Revised component cost = current component cost × (1 + entered increase on that component)
ComponentCurrent costEntered increaseRevised cost
Materials $18.00 10% of material cost $19.80
Packaging $4.00 5% of packaging cost $4.20
Delivery-related variable cost $3.00 0% $3.00
Total variable cost $25.00 8% overall $27.00

The overall increase is $2 divided by the original $25 total, or 8%. Averaging 10%, 5%, and 0% without weighting would produce 5%, which does not describe the cost stack. Components with larger dollar bases contribute more to the total change.

Specify what the price change should preserve

At the unchanged $50 price, contribution falls to $23 and the contribution margin ratio falls from 50% to 46% of revenue. A $52 price restores the old $25 contribution per unit, but its contribution margin ratio is $25 divided by $52, or 48.08%. To restore a 50% contribution margin ratio, price must be $27 divided by 0.50, or $54.

These are different targets. Preserving dollars per unit may leave the percentage lower, while preserving the percentage requires a larger price change. Neither calculation predicts whether the market will accept the new price. Test the volume response separately rather than assuming every prior sale continues unchanged.

Include fixed costs and timing

If monthly fixed costs also rise from $5,000 to $5,300, that $300 increase is not part of the $2 unit-cost change. At 400 units and the original $50 price, operating profit moves from $5,000 to $3,900: 400 × $23 − $5,300. The $1,100 decline combines $800 of variable-cost impact and $300 of fixed-cost impact.

Apply each change from its effective date and account for inventory purchased at earlier costs where relevant. A supplier announcement does not necessarily change every unit immediately. Keep the calculation separate from cash payment timing, and update assumptions when actual invoices replace estimates.

Method references: OpenStax: Break-Even Sensitivity Analysis. Accessed October 22, 2026. All dollar figures are hypothetical worked examples.